Cement Projects
- Michael Carroll
- Mar 21, 2023
- 1 min read
A 10 ft by 10 ft cement pad was poured to put a 15 KW diesel generator that was donated to the Foundation to run the well.

Volunteers readied the site for the cement pour.
Many hands make light work.

Adding anchor bolts to attach a future wooden structure around the generator.

Along with the generator pad a cement head gate was also poured to divert ditchwater to top off the middle pond.
Steve and Mike worked on the head gate while Paul and George screed the generator pad.

24 hours later Steve laid the blocks for the head gate.

Comments